First floor bathroom – 2nd update

After removing the affected wall parts, we got a nice base to reinstall the shower:

   

 

Then it was time to reinstall the plastic stuff, paint ceiling, walls, trimmings, pipes, heater and floor, clean taps and other metal pieces and some other finishings…

  

   

 

We still have to finish same details and decorate, but we have a new, better smelling and almost ready to use bathroom (we still have to make the final cleaning). And before the final result, a picture to remember were we started:

 

And now:

Some other before and after:

       

       

We are very happy with the result. And I am very proud of my guy (that made almost all the work). Now it is time to have fun decorating it!

Carla

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: